Thursday, November 20, 2008

Stamp of approval

So today we had our pre-drywall walkthru. It went great, everything is where it is supposed to be. We did find out that our close date may be pushed back to Feb 6th, instead of Jan. 15th. Bob the builder, no seriously that is his name LOL!!! Anyway Bob had no idea about the change, so maybe we are on schedule after all we should know before Thanksgiving. Tomorrow will be the frame inspection, then Mon insulation will be installed followed by drywall on Tues and Wed. By next week we should have stucco.

On the loan front, we locked into a 90 day lock. The rates came back down after Halloween when they had gone up. We locked today at 6.25% YEAH!!! By Thanksgiving we should have all the final numbers.

We are going to try and get pictures with insulation and drywall. We just have to be sure and get there on time to get them or we'll miss it.

I hope all of you are doing well, and have a great Thanksgiving!!

all ready for stucco

electrical box in garage

plumbing!